How do I get a new meter installed?

Category: Uncategorized

New electric or water meter requests may be initiated on the MGO Connect Customer Portal.   

These services are connected to our utility systems and inspections are required to obtain a permit. 

New Water Meter

Proposed Development and/or Commercial Property:
A Utility Evaluation allows the city to reasonably evaluate the proposed development with existing utility capabilities and for the consistency with the current utility master plan.

Utility Evaluation Information:
Click here for information regarding Utility Evaluations. Utility Evaluations must be submitted online at www.mgoconnect.org under the Systems Engineering Portal.  

For more information or questions, please reach out to engineering@georgetowntexas.gov.